Construction Specialties

Wall protection | Expansion joint covers | Entrance matting

+44 (0)1296 652800
Menu
  • Home
  • Products
    • Acrovyn® Wall & Door Protection
      Acrovyn® Door Protection
      Acrovyn by Design® Bespoke Wall Coverings
      Explovent® Explosion Venting
      Allway® Expansion Joint Covers
      Entrance Flooring
      Pedisystems® Entrance Flooring
      Architectural Louvres
      Architectural Louvres
  • Projects
  • Blog
  • Resources
    • Acrovyn Showcase
      Brochures
      Market Sectors
  • About Us
  • Contact
  • Careers

Expressing Building Movement

Building movement is often a complex, and scary consideration when designing a building. Get it wrong and it could be very costly! One famous (and expensive) example of this is the Guggenheim museum in New York. The Architect (Frank Lloyd Wright) didn’t install expansion joints, leading to a $29million restoration project back in 2007! Yikes!

So, to help you along the way we thought we would take the time to explain the different ways building movement can be conveyed so that when you come across it, or have to do something with it, you understand what you’re looking at.

So, lets take a look at a simple approach to joint movement:

Nominal Joint Width

The nominal joint width is the size of the gap at the start (before any movement has occured)

Minimum Joint Width

The Minimum joint width is the smallest width the gap will become

Maximum Joint Width

The maximum joint width is the largest width the gap will be opened up to.

So, with those figures you can calculate the amount of movement that’s going to occur, but how do you express that movement?

Anticipated movement can either be expressed as a total or overall movement, as a percentage of the expansion joint width or, more usually, as a +/- movement.

There is no right way to do it, different architects, engineers and manufacturers express it in different ways, but it’s important to understand what each one means. If you interpret it wrongly it could be very costly!

EXAMPLE

50mm nominal expansion joint with an anticipated expansion and contraction of 25mm could be expressed as:

50mm +/- 25mm

50mm with total movement of 50mm

50mm +/- 50%

So, there you have it, that’s how building movement can be expressed. As we said before, there’s no right or wrong way of doing it, each Architect, Expansion Joint Manufacturer or Structural Engineer will express it differently. We’ve hopefully just shown you how to interpret it.

If you need help with your building movement get in touch. We’ve been solving complex building movement issues for many years, and have a wealth of knowledge and expertise available at your disposal.

Slideshare Summary

How Building Movement is Expressed from mikehearle

Filed Under: Blog Tagged With: building movement, Expansion Joint Covers

Expansion Joint Covers

  • Full product selection guide
  • Detailed technical information

+44 (0)1296 652800
sales@c-sgroup.co.uk
Order a Sample
Request an Estimate
Get Technical Help

Menu

  • CS Products
  • Projects
  • Blog
  • About us
  • Contact Us
  • Pick Country

Contact

Construction Specialties UK Ltd
1010 Westcott Venture Park
Westcott, Bucks, HP18 0XB
United Kingdom
Get Directions
Tel: +44 (0)1296 652800
Fax: +44 (0)1296 652888
Email: sales@c-sgroup.co.uk

Privacy

This website uses cookies to help us give you the best experience when you visit our website. By continuing to use this website, you consent to our use of these cookies. Find out more about how we use cookies and how to manage them below in our privacy policy.
Privacy Policy

Copyright © 2023 · Construction Specialties